Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
Appendix 5 2 C MGN 371 Checklist
PDF file icon
Appendix 5 2 D NRA Wind Farm Sites
PDF file icon
Appendix 5 2 E NRA Transmission Infrastructure
PDF file icon
Appendix 5 3 A Initial Aviation Assessment
PDF file icon
Appendix 5 3 B Helicopter Impact Assessment
PDF file icon
Appendix 5 3 C Radar Propagation Modelling
PDF file icon
Appendix 5 4 A SLVIA Methodology
PDF file icon
Appendix 5 4 B Meteorological Data
PDF file icon
Appendix 5 4 C SLVIA Secondary Assessments
PDF file icon
Appendix 5 5 A Archaeology

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).